It was way too hot and humid to climb on the porch roof and work on the house tonight, so I decided to finish another very quick workshop project and use up some of the cherry I pulled out for the chisel rack. I built a shelf for my No 2. smooth plane. The nice thing is that I used the No. 2 plane to smooth the lumber after milling.
No. 2 smooth plane on it’s new shelf
The shelf is made from cherry with a piece of what I think is likely teak for the front edge. The teak is reclaimed from an old boat project that Ben and I started years ago and never finished (and eventually cut up the boat and disposed of it). I reinforced the glue joints with 1/8″ brass rod. The whole project was finished with shellac and a final coat of wax.
Shelf installed above the new chisel rack
I have some more space above the chisels, so will make a few more over the next few days. I’ll laser engrave a label on the front of the shelf for the next one; I didn’t think of it until I had already glued on the edge trim on this project.
Tonight I finished a quick workshop project, my upgraded chisel rack. I had previously milled the cherry rack and back board, and cut the slots for the chisels in the rack. Tonight, I finished the groove and attached the rack to the back board. After the glue dried, I finished the project with two quick coats of spray shellac and let it dry for an hour or so. I removed the old rack and installed the new one. The English mortise chisel (pig sticker) doesn’t fit properly in the rack, but it works for now (2nd from right on the picture below).
I have the other half of the cherry board still; I just have to figure out what I want to build with it. Maybe a second chisel rack to allow me to grow my collection of chisels. It is a bit of a sad collection of chisels at this point and not a very coordinated set. But it matches my ADHD (I have Japanese and western style chisels, just in case I get bored with one style). I just need more.
Chisel rack installed. My new saw till is hanging on the right side of the picture.
Today finished up the first of for weekends with Susanna and Isabella away in Sweden. But, with Ben over for the week, it isn’t as quiet as I suspect the next few will be.
We started our day with a visit to a new donut shop, Dixie Donuts. My friend, Mark, recommended it; it is much better than the usual Dunkin. To be fair, this morning wasn’t the first visit. Will and I stopped by there yesterday morning while we were out running errands before Ben came over.
Hewitt Farm, Stonington, CT
After our second breakfast, we headed to Stonington for a short hike at Hewitt Farm and the surrounding trails. It was a good chance to get Hoagie out for a walk and practice some off-leash training.
Will and Hoagie taking a water break at Hewitt Farm in Stonington
After lunch, Ben and I worked a bit on my summer house project, repairing the sun porch roof. I’m working on repairing the soffit and fascia on the main roof in the area directly above the sun porch. That lets me get all the work and wear and tear on the old roof before replacing it. The roof has been leaking for a while; I think the roof pitch is too shallow for the shingles. Today we scraped and washed a section of the upper exterior wall and main roof trim. It is an area that isn’t very visible, and we didn’t paint it when we repainted the house many years ago. Tomorrow I’ll prime the area we prepared and I’ll paint it later this week and move over to the next section of wall/trim to repair. I took the gutter off the upper roof, so I’ll have to figure out how to install one if one is needed for that section.
Chiseling a groove into the back board of the chisel rack.
This evening I milled the back board for the chisel rack that I started on Friday night. Again, I flattened the board by hand, but milled it to thickness on the planer. I jointed the first edge by hand, but didn’t have a good way to mark that wide of a width, so ripped it to width on the table saw. I marked out and started chiseling out the grove that will hold the rack (seen in the background). I’ll try to finish the piece tomorrow night after dinner. Ben and I are watching Westworld in the evenings this week, so I won’t get too much time in the shop.
This morning, Will, Izzy and I drove to the Connecticut College Arboretum for a short photo walk. It was warm and humid early which elicited complaints about the walk early on from Izzy. However, for the most part, she was good company and a somewhat willing model for pictures. Will focused on the wildlife, and I tried to get Izzy to at least not look too grumpy for pictures. She did take some pictures of me, but I had a manual focus lens on, so they didn’t turn out great.
This morning I put the final finish coat on the Saw Till and hung it in the workshop. I made it from yellowheart lumber with some spare flooring milled for the back. I learned a few lessons from this project.
Yellowheart (Euxylophora paraensis) is hard to work with. It has a Janka Hardness of nearly 1800, so it is harder than Hard Maple and White Oak (1600 and 1350 lb Janka hardness respectively). It was certainly tough on the chisels, and the interlocking grain pattern made it difficult to plane. Next time I’ll stick to oak or cherry.
I also didn’t make the till tall enough for all my saws. The saw to the right of the till is about 1″ too long to properly fit on the till. I could probably still put it on the till; it wouldn’t fall out but would stick out the top.
Now to sharpen a few more saws and add them to my collection and figure out my next shop project (maybe improve my chisel storage).
I had the day (mostly) to myself today. Susanna and Izzy departed early this morning to go to New York for Swedish School and Will, for most of today, was busy doing his own things. I had carved out today to be a day to get back into restoring the sailboat. I’ve been working off and on (mostly off) ripping out wiring and patching some holes. Today I got back into restoring the deck. The old non-skid is shot, so I’m slowly sanding it off and my plan is to re-gelcoat the topside. I am using brushable gelcoat. It goes on thick and doesn’t level as well as paint does, but hopefully it will last another 40 years. The trick to getting it to look good is to sand a lot and then buff out the top after it cures.
Today’s project included removing the port side handrail and sanding that section of the cabin top. It was warm enough to apply the gelcoat, so I went through a bit more than half a quart on the bow. It is slow going. The gelcoat starts curing very quickly, so I don’t get a lot of time to work it and have to do a small section at a time. Hopefully it will all look good once I’m done sanding it out. Maybe it would be more efficient to prep the entire topside before gelcoating, but that isn’t really how my brain works (got to love ADHD).
Port side cabin top with the handrail removed.
Gelcoat applied to the bow and very front part of the cabin. I was able to get a second section done after this picture was taken (starboard bow to the front of the cabin.
I was also able to lay the final layers of fiberglass on a hole in the cockpit/cabin that I’m repairing. That will need a layer of fairing compound and a bunch more sanding before it is ready to gelcoat.
I was able to get a little time with Will to work on his boat. We worked on gelcoating his boat (we had done it a few years ago, but he decided he wants it white and not blue (the blue is way too hot on the sun). It was fun to get some time with him in the afternoon before he had friends over for the evening. Kevin Farrar (Farrar Sails, New London) is planning on coming by on Thursday evening to measure for rigging and possibly new sails.
Memorial Day weekend is the start of the crazy rush of a summer. In the past it has always felt sort of like getting on a water slide over Memorial Day weekend and everything is a rushed blur until you get dumped out the other side at Labor Day. This summer is setting up to be the same. Ben graduates High school in a few weeks. On the same day, Izzy has her last day of school and Susanna’s preschool class has graduation. Susanna’s parents are also scheduled to arrive in Preston that morning for a week visit.
Isabela marching in the Ledyard Memorial Day Parade
A few days after Susanna’s parents depart, Izzy and I are starting our 10-ish day road trip to Missouri. It is a long road trip, but I’m letting her have an old phone for the trip. Part of the agreement is that she journal her trip, which she will do on her blog. After Missouri she has a two weeks of summer camp and then she and Susanna head to Sweden for 4 weeks. I’ll hang out here and hopefully get some sailing and camping in with the boys.
This weekend was a good start. Will and I did some work on his loft and picked up some much needed storage for his stuff. Our big house plans was to clean up the back yard and put the pool up; just in time for the 80+ degree sunny day today. Will has been collecting more animals, and caught a marbled salamander in our basement this morning; he is working on a habitat for it. I think eventually he will need to add small critter storage in the basement, but he’s not quite there yet.
Play house and sandbox – ready for the summer.
We finished off the weekend with a nice lunch at a friends house.
Isabella working on a puzzle before breakfast, Memorial Day 2022
Of course, every finished project leads to a new one. The swimming pool is galvanized steel and is showing some rust spots. Probably due to our acidic well water. I’ll have to find some way to protect the pool later this summer. Maybe vinylester gelcoat will stick to the steel.
And of course there is the long list of unfinished projects. the next project this afternoon is to get some more work on Will’s sailboat – assuming I have the energy to get working in the later afternoon heat.
Isabella testing out the swimming pool as it is slowly filled from the garden hose.
I do realize that I’m a lot better at starting projects than finishing them. I have a 26′ sailboat that I am refurbishing, and it may wind up being just a project to work on and never a boat in the water. With that in mind, and the summer coming quickly, I decided that I needed something to get on the water. So, two weeks ago, I picked up a 7′ dinghy. It was small enough to fit in the back of the mini-van.
The new boat. It is ugly, but floats.
The boat was pretty ugly, but looked like it would float. I washed it and sanded and smoothed the bottom. I had a third of a can of gelcoat left from last summer that I used to paint the bottom (or most of the bottom). The big sailboat came with a larger dinghy that I’m just waiting to throw in the trash next time we get a dumpster, but it did have two sets of oars. I sanded the wooden oars and reinforced the blades with some fiberglass and epoxy. I topped it with a few coats of marine varnish. Not the nicest oars, but functional. They might be a touch too long for the boat, but the price was right.
This weekend Will and I decided to take Izzy and his dog, Hoagie, down to the Thames river and test out the boat. Izzy decided that she preferred swimming, and Hoagie preferred the shore, though he started having fun chasing splashes from Izzy swimming. We will make a swimmer of him one of these days. The only problem is he liked to drink the water, and I’m pretty sure it is brackish where we put in (not that I was going to taste it).
Izzy and me exploring the inlet on the Thames river.
The boat is really small, but it floats. Rowing was a pain, there isn’t much room to stretch your legs out when you are rowing and you have the tendency to hit your knees with the oars. Maybe shorter oars would help. Or maybe a trolling motor would make it more fun to explore (though I’d probably have to register it if I put a trolling motor on it). Maybe I’ll paint the sides later this summer if we have any gelcoat left from Will’s boat.
Next time I’ll try freshwater if we are bringing Hoagie. At least then he can drink the water. I canoe might be an even better bet for getting on the water, but enough boats (for now).
A few weeks ago, Will pulled out his sailboat to try to get it ready for the summer. We had pulled off all the deck fittings last summer to paint the top of the boat, but never got back to putting the fittings back on. His boat is a 16′ lifting keel O’Day Wildfire from the late 1960s. A lot of the hardware isn’t original, and the parts that are show their age.
One of the pieces that were in rough shape were the thru-deck bushings. New ones cost $10-$15 each, so why not play around with the 3d printer and try printing them. Commercial bushings have metal linings, so the printed ones may not last as long. But I had spare resin, so there was no real cost to making the parts. Anyway, we could always replace them with commercial bushings in the future if needed. I spent a few nights designing the part on Fusion 360 and made some test pieces. It would probably have been easier if I had a set of calipers to measure the original, but trial and error works as well. The final design seems to fit the boat and I am in the process of printing four – though I think I could probably fit a few more on the print space. The parts take about an hour to print on our cheap printer.
Progression of my design for the thru hull bushings. The final design is on the left and the original piece is on the right.
For the final weekend of spring break, Susanna and I decided to take Izzy to New York City. Izzy and Susanna had Swedish school on that Sunday in New Rochelle, so would have to make the drive no matter what. We made reservations at a Residence Inn in Secaucus, NJ. The hotel is an easy detour from I-95, though the trip down 95 (at least through Connecticut) is pretty terrible. There is free parking and it is a short bus ride into the city.
Ready to head into NYC!Izzy waiting for the bus in Secaucus, NJ. Six years old going on thirteen.
We left home right after breakfast and made it to our hotel by 11AM. It was too early to check in, but they let us park there and pointed us to the bus terminal. Susanna had picked Ellen’s Stardust Diner for lunch and we walked the few blocks from the Port Authority Bus Terminal to the restaurant and Susanna waited in line while Izzy and I explored around the block. We enjoyed lunch (the food wasn’t great, but the singing was lots of fun).
After lunch we walked to Central Park and found a playground for Izzy which was only a little fun since playgrounds are more fund with friends to play with.
Izzy exploring the rocks in Central Park, NYC
After Central Park we headed back towards the bus terminal with a coffee stop in the Swedish Church on 48th Street (Svenska kyrkan i New York) and then back to the hotel. I think Izzy was more excited about swimming at the hotel than almost anything else on the trip.
Izzy braving the cold water at the hotel pool on Sunday morning.
Sunday morning started with breakfast than a swim until it was time to check out. I picked a few places to visit before Susanna and Izzy had to be in New Rochelle. The first stop was the Weehawken Dueling Grounds; that is the site where the Aaron Burr and Alexander Hamilton duel took place. We were there long enough for a few photographs with the NYC skyline as a backdrop and a little history that Izzy is a bit young to care about.
Weehawken Dueling Grounds with NYC in the backgroundIzzy and Susanna at the Weehawken Dueling Grounds
After the dueling grounds we drove to Fort Tryon Park in upper Manhattan. I dove in circles a few times, but eventually found a place to park. We wandered through the park and up the hill to a playground (another playground). There Izzy met two girls that were also carrying around dolls to play with. Susanna walked a bit past the park and found sushi to bring back for lunch. After lunch we wandered back through the park and then headed to New Rochelle where I dropped them off at Swedish School which left me three hours to kill in New Rochelle.
Susanna and Izzy at Fort Tryon Park. Izzy is more interested in her L.O.L. doll catalog than the parkIzzy with her now typical “I don’t want you to take the picture” look on her face.
In New Rochelle, I found a nearby park, Five Islands Park, to walk around for a while. After the park, I headed to the New Rochelle library to upload and edit pictures until it was time to pick up Susanna and Izzy and start the drive back home. Overall a successful weekend vacation!