A little break from the house projects

Susanna in New York

On Sunday, Susanna and I took a day trip to the city.  It was a perfect break.  The weather was warm.  Too warm for October – almost 80.  I dropped the boys off in the morning, and we headed to New Haven to catch a late morning train to New York.

We got there just in time for a late lunch and a nice afternoon walking around – ending the afternoon at Bryant Park.  Of course, it is much better to to read about the trip in Susanna’s blog – “Nutrition for my urban soul” (it might be easier to read using Google translate… at least it is for me).

Today I decided to take an easy day.  I was planning on picking up some rough cut cherry in western MA, but decided to hang out at home instead (I’ll get it next weekend).  It was another perfect day for house projects (Ok, I only took a little break from the projects this weekend).   I did some more painting of storm windows, and started working on the next woodworking project.  I’m making a pair of shelves for the boys rooms ( the weekend wall shelf found wood whisperer website – but out of birch).

Epoxy repairs to the bottom of the storm sash for the bathroom window.

Tonight, Susanna and I headed to Providence to take a swing dancing class.  We got there and stood outside with the other students waiting for the instructor to show up for about 30 minutes… then gave up.  We decided to have some cheesecake on the statehouse steps in Providence – a nice way to end the evening.

Windows, windows, trim, pizza (and a sleepover for Will)

The new trim colors

It seems like all I write about is fixing the windows in this house.  Maybe one of these days I’ll have something more exciting to write.  I’m pretty sure Susanna is getting tired of having to check out each window after I paint the trim and put in a storm window.  And to top it off, she gets to read more about it in this blog…

I think we finally committed to a trim color scheme.  It is Rookwood Dark Green (Sherwin-Williams) trim with Rookwood Dark Brown accent colors.   We are still discussing what color to paint the house (I’m thinking that the house may get painted next summer – so I’ll live with unmatched trim for a while – I think the white is a bit to bright compared to the dark trim).  I also found out that Will has a difficult time telling the difference between the green and brown trim colors.

Painting the storm window

I dug out all the existing storm windows from the basement (and barn) yesterday.  I started repairing the one that is in poor shape and painting the rest.

I installed the new storm window hanging hardware from Kilian Hardware.  It is much nicer (and a lot more expensive at $20/set).  I had been trying to find a better way to latch the storm windows in – and these seem perfect.

I’m guessing this will be the last long warm weekend of the year to work on the house – which is good – I’m almost out of green trim paint and am holding out until the spring to get another gallon.

A not so clear picture of the new latch - it fits over the exterior stop and pulls the window tight

In addition to a busy day working on the house, we had a crazy kids day here. A little before lunch, the boy next door, Justin, came over to play.  Then after lunch, Ben invited his best friend, Anthony, over.  A little later, Will’s best friend, Shane, came over.  Everyone stayed through dinner (homemade pizza) and a movie (“Matilda”).  Justin and Anthony went home, and Shane stayed over for a sleepover (Will’s first and Shane’s first at another house).

So, here we are at 9pm, with Will and Ben asleep, and Shane down here talking to Susanna.  It is never easy to sleep in a new place.

Two windows with painted trim and storm windows installed. Window sashes will be brown when I get to repairing them.
Front porch with trim painted.
The boys watching "Matilda" (picture thanks to Susanna)

More window work….

I’ve started the outside window work that I want to complete this fall… storm windows.  The goal is to replace as many of the crappy storm windows as possible.  I set up the scaffolding below one of the windows in Ben’s room and took off the storm window.  I am taking the time to paint the trim when the storm window is out.

Broken exterior stop

When I removed the storm window, I found the exterior stop cracked.  I pulled out the bottom half of the stop, and milled a replacement (which I installed this week).  Note to self: it would be much easier to install the stop with a nail gun next time.  It was a real pain to hold the stop next to the window and nail it in on the same time…. a nail gun would have solved that problem.  It doesn’t help that the scaffolding is a little short for working on that window as well (yes, I’ll get pins to stack the scaffolding before the next window).

Susanna and I decided to paint the trim green around the windows.  It looks much better – I’ll take pictures the next day it isn’t raining.  We are thinking about painting the storm windows brown.

This past weekend I dug out one of the old original (wooden) storm windows to replace one of the broken aluminum storm windows in the living room.  I removed the glass and primed and painted half of the storm window.  Next to paint the rest and hang the window.  I ordered more glazing compound and a new style of window hanger (they look much better than the ones I had been using).  I also ordered some weatherstripping to put between the storm window and the stop.

This weekend I’ll get the brown paint for the storm windows, and hopefully get some of the storm windows installed and more of the trim around the windows painted.  Thursday I’ll swing by the glass store to get replacement panes for the original storm windows and see my options for removable panes for the storm windows on the second floor… Let’s see how much I get done before the weather gets cold.

A saturday afternoon bike ride

On our bike ride

This afternoon we decided to take a bike ride and explore  one of the local rail-trails – the Airline State Park Trail.   I had to dig out Susanna’s bike, fill up the bike tires, and find everyone’s helmets.  We packed the four bikes into the back of the mini-van, and headed out to find the trail.

We had a great ride – enjoying the cooler weather.  I’m not quite sure how far we rode – the bike computer’s battery is dead.  But it is sometimes nice to just ride and not worry about how far you have gone.   Tomorrow I’ll get back to work on the house – get the scaffolding set up to work on Ben’s window and pull out a couple of the lower storm windows…. getting ready to replace storm windows before the winter.

The Airline Trail
Susanna and Ben riding over the bridge
View from the trail

Another Project Completed

Lumber Pile in Garage Bay

I completed one of my short summer projects – just in time to head to Australia.  I built a much better lumber stack in the unused garage bay.  It had been sitting in one of the bays where I park, but I needed to make the stack flat so the wood wouldn’t dry bowed.  I also made the stack 4-feet deep vice 2-feed deep.

I had forgotten how heavy the red oak planks were.

I may someday move more lumber into that garage bay, but not this summer…

And it is finally finished

Ben's new room

I finally finished Ben’s bedroom today.  Almost all the tools are back in the shop (ok, one more trip left).  I just finished touching up the paint – but it is a boy’s room – so touching up paint could be a weekly project if I desired.

He now wants shelves in his closet – but I’m counting that as a second project.

Now off to the movies (something to do on a rainy day) – then to Target to get some storage bins for Ben.  He is slowly in the process of moving his stuff from his old room to the new one.  I won’t show a picture of the big pile of toys and stuff he has in his old room – I’m hoping he decides to go through it and throw a lot out.

A broken window…

Will helping repair his broken window pane
Will helping repair his broken window pane

The afternoon started off well.  The boys were about as expected, running around with their friend, Justin.  Of course at times it got a little out of hand.  Of course one of those times, Will got in trouble (don’t worry, Ben got in trouble as well the other time).  So he got a time-out in his room (and yes, for those without kids, time-outs do work).

I’m outside with Ben and Justin – I have my phone set to go off when Will’s time-out is over.  From above, I hear the sound of glass breaking – from Will’s window.  I run upstairs – a little angry- I’ve assumed the window broke because he was angry and threw something that broke the window (hey, seems fair – the usual cause of broken windows is things being thrown ).

Well, it turns out that he wasn’t throwing things.  He had just been leaning with his hand on the window pane and it broke.  And he was upset – upset about the time-out – scared he had broken his window (there was glass all over the floor).  Thankfully the only thing on him was a small scratch on his arm (I am VERY thankful for no trip to the ER).

So, after he calmed down (and I calmed down), I sat down with him.  I told him that he wasn’t in trouble (it was an accident), but that he needed to help fix the window.  That made him more upset (he wanted to play with Justin).  I told him it wouldn’t be all afternoon – if I break a window, I am expected to fix it, so it seemed fair if he helped.

I think he must have realized that it wouldn’t be fair to play the whole time I was working on fixing the window he broke – he complained a little bit, but did help with the window.

We carefully cleaned up the broken glass (work gloves and shoes on).  Then off came both stops, and out came the sash.  I don’t know why, but the stops on this window have only one screw in the middle, and nails on the top and bottom.  Maybe I’ll change it to three screws each tomorrow when I put the window back together (like the rest of the windows in the house).

Will cleaned out the rabbet where the broken pane had been (lots of nice old hardened putty).  I removed the other pane (the putty was in bad shape – and since he had only broken the one pane, Will didn’t have to help with that pane). Then Will was back to paint the sash.  After the paint had dried to the touch, we put a new piece of glass in (strangely enough I had a new piece of glass sitting around the right size), and reglazed the window.

I use Glaze-Ease from Advanced Repair Technology, Inc. to glaze the windows.  I love the fact that it can be painted 2 hours after glazing (traditional glazing needs to cure for several days prior to painting).  It comes in a caulk tube and they have a special tool to get the finish to look like traditional glazing.  I’m still working on getting it to turn out perfect – but this is a second floor window, so no one will see the glazing job.

Tonight I painted the glazing and removed the tape.   Tomorrow I’ll second coat the glazing, and Will and I will wax the sash where it rubs against the parting bead and stop (keeps the paint from sticking) and put the window back together.

So Will gets one night without a lower sash (he still has a storm window).  And he had a lot less play time this afternoon than he had originally wanted.

On the good side, Will learned how to take the lower sash off a double hung window and replace a pane of glass.  Another good thing – that window sash was in the worst shape of all of them in the house – so reglazing and repainting was needed.  Even better – I got to work on a project with Will for a good part of the afternoon.  And I’m pretty sure he won’t lean on a window again.

Making the baseboard trim

Ok… so the room isn’t totally done.  Just almost done.  Yesterday I made the baseboard trim.  I had decided that I wanted trim that was taller than I could get at the box store, so I purchased a router bit to make the molding.  Initially I was going to use some of the red oak I have sitting around to make the trim.  But that would require me milling the lumber.  And since it was going to be painted anyway, I started with 1×8 pine from home depot.

The router bit for making the trim

First I made a test piece from a piece of a 3/4″ x 7 1/4″ board I had sitting around.

The sample piece of baseboard trim

This allowed me to check the look of the trim before I decided to go purchase the lumber.

Test fit of trim - chcecking how it matches up with the door trim.
Checking the fit - relative to the outlet placement

After Ben and I had agreed that the trim was a good fit to the room, I went out and picked up the lumber and spent the afternoon milling the baseboard trim and priming the trim.

Today, I plan on painting the trim, and will put it in tonight (or later this week if the paint isn’t dry enough to install today (It is humid and raining – it may take longer to dry than normal).

At least Ben has been sleeping in the new room – he is very happy to have a larger room.  He just hasn’t moved all his stuff over; he is waiting for me to finish the trim before he does that.

A long project… nearly done….

Ben's first night in his new room

I’ve been working on Ben’s room for a long time.  A very long time.  I started in the room when we first moved into the house.  And it kept going on and on…  It’s really not that fancy or complicated of a room to renovate.

A lot happened since I started the room, including a divorce and a year living in a different house.  And the room stayed under construction the entire time. After a while, the project just seemed to live there and have no end in sight.  I would start other projects instead of finishing the room.

Not that I chose the easiest path to redoing the room.  Initially the though was to keep the original plaster.  So we peeled the wallpaper off the walls.  Then, after leaving and coming back a year later (after much discussion with my dad), I decided to tear out the plaster walls on the exterior wall so I could insulate the room.   That was last August (a year ago).  My dad showed up and we spent a part of a week late that fall, and we put the insulation up and put up the walls, and the plywood for the ceiling (I had purchased materials to put up a tin ceiling several years ago).

I spent that winter putting up the tin ceiling.  I had to hand nail every 6-inches with the painted decorative nails.   This spring I got the windows in, and at the beginning of the summer, I ordered the flooring.  I also had to install the crown molding.

I finally go the floor installed last night, and Ben wanted to move his bed in today.  As I write he is spending his first night in the room.

It was a lot of work…. I restored both windows (repaired and repainted the sashes, and replaced the sash cord with sash chain).  I installed a metal ceiling.  The room needed all new electrical – so I added outlets on all the walls, and a switch for the light.  I ripped out three walls, and installed drywall on all the walls (covering the plaster on one of the walls) – I had a lot of help for that.  I installed a new floor (an inexpensive cork floor – but it feels nice under the feet) and painted stripes on the walls.

I had a lot of help with the project.  Thanks to my dad for helping get me moving on the project last year.  And this summer I was able to get a huge amount done thanks to Susanna’s help and encouragement.

Of course it’s not completely finished.  I still need to mill and install the baseboard trim (but Ben didn’t want to wait).  One of the outlets is missing the cover (I couldn’t count when I ordered the outlet covers).  The paint needs to be touched up, and the crown molding needs to be caulked.  I should get most of that done this weekend – assuming I can find enough red oak to make the baseboard trim (ok, shouldn’t really be a problem).  Of course one of the sash chains came off today – but I may wait a while before I fix that – the window is still working.

Enjoying Dinner on the New Patio

It has been a very busy summer… at least the boys and I have been able to enjoy the other big summer project – a new patio in the back yard.  I think I’m going to take it easy on house projects for a little bit.  The workshop is a disaster and needs to be cleaned, and I have a whole list of woodworking projects that I want to finish.

Six Flags….

Ben at Six Flags

Yesterday we decided to take a family day and visit Six Flags of New England.  Wet Mark and Jessica Matkovich, and Nick and Sarah.  Of course, as the only ones in the group with kids, we wound up spending most of the day with just the four of us.

We got tickets at the Submarine Base MWR office – a great deal for those able to get tickets there.  Our plan was to get there when it opened at 10:30.  We had a little late start, but were there by 10:40.

We picked a perfect day for a trip to the park.  It was overcast and threatened to rain all day – which meant no crowds – though maybe it being a week day was a bigger reason than the weather.  The overcast sky also meant that it wasn’t too hot.

The boys got their first chance to ride on real roller coasters.  Ben was just a little too short to get on a bunch of the rides (a lot of the rides need him to be 48″ tall; he is 47″ tall).  Will was just big enough to fit on all the rides (54″ tall).    We started the morning on the newest roller coaster – some sort of mouse maze type (Gotham City Gauntlet Escape).  Not very fast, but lots of turns and starts and stops.  It was a pretty good start.  We also spent a lot of time on the one they called “Catwoman’s Whip ” – a mild family coaster – but much better than the ones that are at the local fairs.

Getting ready to get wetThat afternoon, I was able to get Will on some of the bigger rides.  We started with the smaller of the two wooden coasters.  Ben was almost tall enough – next year he’ll be able to ride it.  Will came off that ride and said “That was SOOO scary.”  And he didn’t want to do it again.  So we went back to the smaller rides.  I finally convinced him that there was no line for the big wooden coaster – so he went on it with me.  Much scarier than the smaller one.  But he did it.  And he screamed every time we went down a hill.

And then we walked by the biggest ride in the park, “Bizarro” – a huge fast metal coaster.  With the first drop a 225 foot plunge and reaching 77 miles an hour.  There was no line in the afternoon, and he said he would try it.  Talk about scary……  But he did it.  He kept talking about it the rest of the day.  The final big ride we did was “Batman,” with two loops and two corkscrews.  He said that one wasn’t nearly as scary as the big one.

We finished the day by letting the boys run through “Pandemonium” several times by themselves… It is the best ride Ben could get on this year (the cars spin as the coaster goes around).  Then took the skyway back to the center of the park, and finished with a ride on “Catwoman’s Whip.”

Overall, we stayed until almost 7:30pm.  Nearly 9 hours at the park.  What a great day.