“Row, Row, Row Your Boat”

Susanna and I took the “new” inflatable dinghy down to the river and spent a few minutes enjoying the evening on the sailboat.  We took Targa with us. He hates the water. So does Tucker. But Targa doesn’t get carsick, so he gets to the be the first to visit the boat.

Susanna and Targa enjoying the view from the mooring
Susanna and Targa enjoying the view from the mooring

Of course we had to row the dinghy from the launch to the mooring…

Quick Dingy Restoration

Dinghy underside after washing and sanding. Next step was to clean with a solvent.
Dinghy underside after washing and sanding. Next step was to clean with a solvent.

Yesterday, the boys and I picked up a used 10′ Achilles inflatable dinghy. It is an older model, and wasn’t in the best shape. But it was only $80 so it was difficult to pass up. The boat building project is going slowly, so I decided it would be worth picking up a functioning dinghy until I finish with the one I’m building. Or maybe I just like collecting things – I’m taking a break from collecting lumber, so maybe I’m starting with boats. Okay, not really, but I’m guessing that someone in this house wonders about that…

The dinghy had been kept in the water without any anti-fouling paint, and had barnacles on the bottom. Two of the air tubes also have slow leaks in them. It should be a quick project to paint the bottom and fix the slow leaks. Since the boys and I picked up bottom paint at the boat store yesterday and didn’t get the stuff to fix the leaks, today I’m painting the bottom.  The air leaks will have to wait until later this week.

First step was to clean the boat and remove the barnacles. Last night I scrubbed the entire boat, and carefully used a putty knife to remove the barnacles. This morning I let the remains of the barnacles soak in vinegar and then rinsed and let the boat dry. After the boat was dry I sanded the bottom as smooth as I could without damaging the fabric. I again rinsed the boat off and then cleaned the bottom with a solvent (I used MEK because that is what I had – and it dries very quickly).

Dingy bottom after the first coat of paint.
Dingy bottom after the first coat of paint.

Susanna and I moved the boat into the shade to make it more pleasant to paint, and to make sure that the bottom paint didn’t dry too quickly. I finished the first coat, and will let it sit for 4 hours and then apply a second coat this afternoon. I may apply a third coat, because I think there will be enough for a third coat in the can, and I may as well use it up (though maybe I can store it in the basement and get try to get another coat out of the quart next season).

Now back to the workshop.

Dogs, dogs, dogs

Babysitting Leslie this weekend. Ben is happy to have a dog that will sleep in his bed. Targa sleeps in Will’s room; Tucker is too annoying; Leslie is just right. Except for waking up at 5:45.

20140622-082623-30383582.jpg

Enjoying the Sun on the Niantic River

The sailboat was a good addition for last summer, even if we only had it in the water for two months. I won’t mention how many (10+) years it sat in the yard or garage over the summer, unused, prior to last summer. But it is done now. Or rather, done enough to keep in the water.

Will, Ben and Susanna enjoying the sun as we anchor on the Niantic River.
Will, Ben and Susanna enjoying the sun as we anchor on the Niantic River.

We are keeping the boat in the water the whole summer. We have a mooring on the Niantic River, a venue change from the muddy Thames River last summer (and the inconvenience of staying on the navy base).

Today we went out to enjoy the sun. We tied the boys’ kayaks behind the boat and motored a bit and anchored. When we were bored with that spot, we lifted anchor and moved downriver a little more. The boys explored the coast while Susanna and I enjoyed the perfect weather.

We aren’t able to put the sails up again until Susanna and I un-step the mast and I reattach the spreader that fell on the trip over from the Thames River. Hopefully I can talk her into helping with the mast next weekend. But maybe we will just enjoy the river again next weekend.

We also picked up a 10′ Achilles inflatable boat off of Craigslist. It was a steal at $80, and will make life with the mooring much easier. I’m still working on a wooden dinghy, but the going is slow on that project, and I’d rather take my time with the boat and make it look nice. Tomorrow is project day (including cleaning up the dinghy and applying bottom paint).

Susanna enjoying the sun at our first anchorage.
Susanna enjoying the sun at our first anchorage.

A long day on the water (and a great Father’s Day)

The planned route from the Thames River up the Niantic River
The planned route from the Thames River up the Niantic River

I had a great Father’s Day. I had been planning on putting the sailboat in the water today, but it was a long sail from the launch in the Thames River to the mooring up the Niantic River. I didn’t expect the boys to want to go, so I had originally planned to either do the trip by myself or have a friend along. But last weekend, Will and Ben decided they wanted to go for the trip. I warned them that it would be a 4 hour trip. And they still wanted to go.

This morning, Mark Matkovich helped me launch the boat and step the mast. The boys and I headed into Long Island Sound. The wind was blowing so we set up the mainsail and wandered west past New London, Ocean Beach, and then past Millstone nuclear power plant into Niantic Bay.

In the bay the wind dropped a bit and our speed slowed to under 3 knots. We decided to put up the jib and as the breeze picked up we made over 5 knots with the rail almost in the water.  The boys (and I) were a little nervous with the stronger gusts, but after a while we got more used to the sailing (yes, on an old O’Day 22, the headsail makes all the difference – I think in later years they modified the design to carry a bigger mainsail and smaller headsail).

Heading under the Rt 156 bridge into the Niantic River.
Heading under the Rt 156 bridge into the Niantic River.

In the bay, one of the spreaders came loose and fell down. We quickly dropped both sails and started the motor.

The Niantic Bridge (Amtrak Bascule Bridge) was already up (lots of traffic on the river on the weekend) and we can squeeze under the Rt. 156 bridge without needing it to raise.

We motored up the river to the mooring where Susanna was waiting for us. It only took three tries for Ben, Will and I to catch the mooring pendant after unloading at the dock. The entire sail took 5 hours and the planned route was 12 miles, so I’m guessing we sailed 13-14 miles (with tacking).

Susanna and I will have to step the mast one of these days to repair the spreader before we go sailing again. However, we should be all set to motor around the river to let the boys go swimming.   Now I just have to finish the dinghy to make use of the mooring easier.

A picture of the boat on its mooring in the Niantic River.
A picture of the boat on its mooring in the Niantic River.

A tour, boat painting, friends over, playing in the sprinkler morning.

Will, Ben and Tyler at the former Norwich State Hospital property
Will, Ben and Tyler at the former Norwich State Hospital property

We had a busy morning. The town of Preston was offering a bus tour of the former Norwich State Hospital, Will and Ben wanted friends over, and I want to get the boat ready to get in the water next weekend.

We picked up Will’s friend, Tyler, on the way to the hospital tour, and the boys were surprisingly well-behaved for the 40 minute bus tour, even though they probably got a little bored by the end. However, they all took lots of pictures and will probably post some on their blogs later today (I think Ben took well over 100 pictures during the tour).

After we came home, I moved the boat and mowed the grass under it. Then the boys helped me paint the bottom of the boat (second coat) – so all I have to do is jack up the boat to paint where the rollers touch, get the outboard running, and finish varnishing the tiller handle – not too much to do in a week.

The boys are out running through the sprinkler enjoying the sunny warm day while I try to get green paint spots out of my hair, write in my blog and make lunch.. It is nice to have a kind of odds-and-ends sort of day.

Will and Ben on the bus tour of the Norwich State Hospital property.
Will and Ben on the bus tour of the Norwich State Hospital property.
The boat, bottom painted and almost ready for the water.
The boat, bottom painted and almost ready for the water.

Trains, trains, old trains, rust and other stuff.

This afternoon was a “take a break from your sibling afternoon.” Susanna took Will to “Launch,” an indoor trampoline house. I took Ben to the Connecticut Eastern Railroad Museum. What a great time. It was dirt cheap. Only $6 for both of us to visit. It isn’t the biggest museum, but it is a great deal (and the trains are mostly open to climb around on – one just has to be careful).

Ben enjoying our ride on the flat car.
Ben enjoying our ride on the flat car.
Ben exploring one of the engines.
Ben exploring one of the engines.
Ben on one of the engines.
Ben on one of the engines.
Ben on the handcar. We were able to take the car up and down the track.
Ben on the handcar. We were able to take the car up and down the track.
Ben waiting for a ride on a flat car.
Ben waiting for a ride on a flat car.

Another weekend project finished…

A new reading corner in the loft above the garage. I had boxes of books that I didn't have space for in the house - the loft was a perfect place for them.
A new reading corner in the loft above the garage. I had boxes of books that I didn’t have space for in the house – the loft was a perfect place for them.

This year, Susanna and I are trying to focus on smaller projects. Projects that can be finished in a weekend. Over the past couple of years, we have completed many major projects that took several months to complete and we thought it would be nice to take a break from the big projects for a while.

This was one of the weekends where the boys aren’t here, so we tackled a bigger weekend project. We have two big out buildings. One is my workshop, and I have been keeping it in pretty good shape (though the lumber stack below the workshop, and the storage area above it could use a good reorganization). The second building is our garage. The garage has a second floor that has been a focus on our improvements this year.

One side of the loft above the garage is the boys’ play room/game room. I finished that for the boys for Christmas. It was a big change from the dirty wreck of a play room that they had before. However, to get to the play loft, one had to go through the other side of the loft – the storage area. It has been a disaster for the past couple of years. Okay, since I moved here.

Next to the reading corner is space for a card table. Maybe a place for Susanna and Ben to do jigsaw puzzles.
Next to the reading corner is space for a card table. Maybe a place for Susanna and Ben to do jigsaw puzzles.

I did have one set of shelves built many years ago, but it wasn’t enough storage (okay, if we got rid of stuff it would have been). But the space didn’t feel special. This weekend I added lights and built a second set of storage shelves and a book shelf. Susanna organized and cleaned. The end result is another pretty cool space to hang out.

I know we probably won’t spend much time there, but it is nice to have another cool nook to sit on the property.  It is nice to have Susanna to help encourage me to finish projects and not just start them.

The space isn’t perfect. It gets hot in the summer and cold in the winter. I am hoping to add an exhaust fan later this year to keep the temperature more reasonable.  One of the window panes is still broken (Ben broke it earlier this year), and that will need to be another short weekend project to fix.  We may also add a window air-conditioner to the boys play room (on a timer of course) – hopefully they can keep some of the mess out of the house.

We even added decoration to the stairs up to the loft. The boys play room can be seen through the doorway on the right.
We even added decoration to the stairs up to the loft. The boys play room can be seen through the doorway on the right.
The original shelves are to the right. The new shelves are on the left (the reading corner is on the other side of the shelves on the left). The new shelves are made from a bunch of maple and oak lumber I have left over from last summer.
The original shelves are to the right. The new shelves are on the left (the reading corner is on the other side of the shelves on the left). The new shelves are made from a bunch of maple and oak lumber I have left over from last summer.